基尔城堡音乐厅 | gmp与bbp中标改建设计
阅读:5171 2019-10-23
建于1965年的基尔音乐厅将在未来几年内进行改建,在州府基尔竞争性谈判中,gmp·冯·格康,玛格及合伙人建筑师事务所与他们的合作方基尔建筑师事务所bbp共同胜出。改建设计的重点,是对音乐厅进行声学与技术方面的提升,音乐厅设有1400个座位,可举办古典音乐会、戏剧演出、节日活动以及举行会议。

The plan is, in the years to come, to refurbish the concert hall dating from 1965 in accordance with conservation principles. In a two-stage process negotiated by the administration of the state capital, Kiel, the architects von Gerkan, Marg and Partners, together with the Kiel architects' practice bbp, were successful in obtaining the commission. The refurbishment will focus on the acoustic and technical upgrade of the concert hall, with 1,400 seats for classical concerts as well as for theater performances, festivals, and congresses.

640.webp.jpg

从城堡广场看向音乐厅入口及海港露台 © gmp Architects

基尔城堡位于基尔峡湾西侧老城区的北部,前广场毗邻市中心,从城堡后侧和城堡花园可以一览海港景观。今天基尔城堡的旧建筑遗址,在第二次世界大战中被摧毁之前,一直是德国石荷州文艺复兴时期最重要的建筑之一,目前只有西侧的部分保留了下来。1965年,在汉堡建筑师Sprotte与Neve重新设计了东侧的建筑以及音乐厅。整个建筑群在2005年被列为文物保护建筑。在竞争性谈判的最初阶段,bbp的建筑师们进行了概念设计研究,研究表明了改建音乐厅的必要性,以及对建筑结构进行改造的可能性。
Kiel Castle is situated to the north of the old city and to the west of Kieler Förde. Whereas the forecourt is linked with the inner city, the rear and the castle garden afford views across the port landscape. Until its destructionin World War Two, the old Kiel Castle, one of the most important buildings of the Renaissance in Schleswig-Holstein, of which only the west wing survived, stood on the site occupied by the contemporary building. The new east wing and the concert hall designed by the Hamburg architects Sprotte and Neve were opened in 1965. In 2005, the entire ensemble was listed as a historic monument. In the initial stages of the negotiation process, a concept study by bbp: architekten from Kiel demonstrated the need for refurbishment of the concert hall and illustrated the possibilities regarding changes to the building fabric.

640.webp (1).jpg

音乐厅入口门厅 © gmp Architects

gmp与bbp的改建设计,旨在维护和恢复音乐厅的原始状态——1960年代初的现代建筑的典范。例如,使用明亮的材料和新的照明设计来彰显门厅与音乐厅的特质,这些空间将构成一个富有创意的统一的整体。通过声学设计和设备提升,使得音乐厅在未来满足古典音乐会的需求以及其他活动,例如戏剧表演、节日活动及会议等。

The design by the architects von Gerkan, Marg and Partners (gmp) and bbp: architekten for the refurbishment aims to retain the concert hall and tore-establish its original condition, as this was an outstanding example of modern architecture of the early 1960s. For example, light materials and a new lighting concept will once again emphasize the qualities of the foyer and the hall, and link the spaces to create conceptual and atmospheric unity. With improved acoustics and technology, the hall will in future fulfill the requirements of classical concerts, as well as of various types of events such as theater performances, festivals, and congresses.
gmp将从多个已建成的音乐厅建筑中汲取经验,应用到基尔城堡音乐厅的修复改建设计中。在2017年完成的德累斯顿文化宫的修复改建,为德累斯顿爱乐乐团提供了一座崭新的音乐厅,该项目获得了多个奖项的表彰。此外,近年来在中国已经建成几座大型的音乐及剧院建筑,例如2009年建成的重庆大剧院,2010年完成的青岛大剧院,2012年开幕的天津大剧院,以及2018年落成的位于南宁的广西文化艺术中心。位于慕尼黑的模块化音乐厅正在建造中,它将作为慕尼黑爱乐乐团的临时演出场地。同时。作为gmp合作伙伴的基尔本地建筑师bbp,他们在多年研究中获得了有关基尔音乐厅概念设计的丰富经验。
For the purpose of the refurbishment of the concert hall at Kiel Castle, the architects von Gerkan, Marg and Partners (gmp) are able to rely on their experience from a number of concert halls they have completed, such as, in 2017, the refurbishment and modernization of the Kulturpalast Dresden that includes a new concert hall for the Dresden Philharmonic Orchestra, which has received several awards. In addition, they have been responsible for several large concert and theater buildings in China, such as the Grand Theater in Chongqing (2009), the Grand Theater in Qingdao (2010), the Grand Theater in Tianjin (2012), and the Guangxi Culture and Art Center in Nanning (2018). Currently, the modular Gasteig interim concert hall is being created as a temporary venue for the Munich Philharmonic Orchestra. In bbp:architekten,  gmp have the benefit of experienced local partners who contribute their experience from the concept study for the Kiel concert hall, a study that took several years.

竞争性谈判2019年中标
设计曼哈德·冯·格康和施特凡·胥茨及克雷斯汀·赫尔蒙特
项目负责人克雷斯汀·赫尔蒙特
竞争性谈判阶段gmp设计团队Anna von Aulock, Tobias Alexander Schmidt, Nadja Stachowski, Jens Weiler
合作设计公司bbp:architekten,基尔
竞争性谈判阶段bbp设计团队Sven Heitmann, Doris Hönig, SvenFriedrichs
业主州府基尔市
音乐厅面积6300平方米
座位数1400个


Negotiation Process(VgV) 2019 – Contract Awarded

Design Meinhard von Gerkan and Stephan Schütz with Christian Hellmund

Project Lead Christian Hellmund

Negotiation Process Team gmp Anna von Aulock, Tobias Alexander Schmidt, Nadja Stachowski, Jens Weiler

Partner practice bbp: architekten bda, Kiel

Negotiation Process Team bbp Sven Heitmann, Doris Hönig, SvenFriedrichs

Client Kiel, capital of Schleswig-Holstein

NFA concert hall 6,300 m²

Seats 1,400


ARCHINA 所有平台上发布的项目、招聘、资讯等内容,部分由第三方提供或系统自动收录。资料版权属于第三方,若信息不实或涉及版权问题,需要版权方和第三方沟通,ARCHINA 将配合对接,并在确认无误后删除涉及版权问题的信息,相应的法律责任均由资料提供方承担。
推荐阅读  
由世界知名建筑设计公司DLR Group设计的上海宝山长滩“风塔”项目惊艳亮相。该项目由定海神针”——上海宝山长滩观景塔(以下简称“长滩观景塔”)与“东海龙宫”——上海宝山长滩音乐厅(以下简称“长滩音乐厅”)等组成
2024-02-08DLR Group 亚洲区 地标 音乐厅 观景  阅读:9213
本周四,奥斯特拉瓦市市长Zdeněk Macura宣布,Steven Holl Architects + Architecture Acts 在奥斯特拉瓦赢得了一个音乐厅的国际比赛。获胜的提案得到了评审团七名成员中六名的支持票。


评论


请 [登录] 后评论

资讯概况